Building structure and file assignment

Admin, building lists + Export IFC Data

Creating the structure and assigning drawing files involves three steps:

  1. Start by structuring the project using the following levels: "Structure", "Building" and "Floor Level". Click a structural level in the top right section of the dialog box, press and hold down the left mouse button and drag the level into the Project Structure area.
    For more information, see Creating the project structure.
  2. Now assign drawing files from the project to the individual levels. Select the drawing files, press and hold down the left mouse button and drag the files over to the required level in the Project Structure area.
    See Building lists, assigning drawing files.

    In the Project Structure area, select the drawing files and levels you want to include in the list output. Activate the relevant branch in the three structure.

    The elements are selected.



(C) Allplan GmbH Privacy policy