Contents

Index

Changing the drawing file status

Open on a Project-Specific Basis

With the drawing file status, you define the drawing file on which you draw and which drawing files are visible and/or can be modified. For more information, see drawing file status.

To change the drawing file status

  1. Click Open on a Project-Specific Basis (How).

    Tip: You can also double-click the left mouse button in the workspace.

  2. Select the drawing files (in tree view) whose status you want to change.
  3. Define the drawing file status in one of the following ways:

Tip: You can also use the shortcut menu to change the drawing file status. Click an element in the workspace with the right mouse button and select Change drawing file status on the shortcut menu.



(C) Allplan GmbH Privacy policy