You can use the building structure and the fileset structure in parallel manner. The drawing file status can be set in the fileset structure and in the building structure; these two settings are independent of each other. The drawing files are activated depending on which of the two tabs is active when you close the dialog box.
Important difference: a drawing file can only be assigned to a structural level once in the building structure.
(C) Allplan GmbH | Privacy policy |